Construction of a high storage warehouse with an area of 1 146 m2, a height of 11.75 m at the attic, with two loading docks and sanitary facilities. The main structure features reinforced concrete columns with steel girders; the facade comprises sandwich panels; the flat roof features thermal and water insulation and a roofing membrane system. This is an extension of the existing facility, for which the project provides a connection to the existing hall. The implementation includes the creation of a descent to the docks, completing the access road and hardening the area with paving stones.